Presentations
![]() |
![]() |
![]() |
Subcategories:
![]() |
Files: 0 | |
-
PMC Lift II Mining Project Overview (709.93 KB)
-
OPTIMISING VENTILATION AND COOLING SYSTEMS FOR AN OPERATING MINE USING NETWORK SIMULATION MODELS (1.06 MB)
-
A review of the safety successes at Wessels Mine (688.11 KB)
-
AMMSA Technical Paper Guideline (182.3 KB)
-
Primary development using hydropowered drilling and watergel explosives at a South African gold mine (446.14 KB)
-
Strata Movement Encountered during shaft sinking at 17a shaft Crown Mines limited 19th January 1934 (30.75 KB)
-
South Deep – The Challenges (464.13 KB)
-
Some Notes on Sinking Vlakfontein No 1 Shaft (303.34 KB)
-
Material Incline Winder Evander No 7 Shaft (541.36 KB)
-
Headgear Upgrade over an Operating Shaft (952.17 KB)
-
Construction of a Concrete Plug in the South Deep Main Shaft to seal off a major water intersection (3.02 MB)
-
Stope Panel Rating System (471.19 KB)
-
Stick and pillar support on Union Section -RPM (154.77 KB)
-
Preparation for Mining the No 2A Sub-Shaft Pillar at the Hartebeestfontein Division of Avgold (740.51 KB)
-
Design of a Pillar Support System for use with Mechanised Mining at depth in the Bushveld (465.53 KB)
-
Aspects of the Seismic Response to Shaft Pillar Mining - Case Studies in the Welkom Gold Field (618.01 KB)